T-Mobile Modernization

T-Mobile’s Modernization project began in Miami, Florida, in 2012 and currently includes 450 sites with a 50 percent ground and fifty percent rooftop site mix. The services required from CALTROP on the project included site design visits, lease exhibits, photo simulations, boundary surveys, elevation certificates, landscape designs, zoning drawings, zoning hearings, platform analyses, antenna mount analyses, antenna mount designs, stealth designs, tower mappings, foundation mappings, geotechnical soil borings, tower analyses, tower modification designs, tower evaluations, electrical upgrade designs, construction / permit drawings, pre- and post-construction roofing inspections, special inspections and annual inspections.

LOCATION: Miami, FL
CLIENT: T-Mobile
PROJECT VALUE: $221 million

PROJECT FEATURES

  • More Than 450 Sites

SERVICES PROVIDED

  • Site Design Visits
  • Lease Exhibits
  • Photo Simulations
  • Boundary Surveys
  • Elevation Certifi cates
  • Landscape Designs
  • Zoning Drawings
  • Zoning Hearings
  • Platform Analyses
  • Antenna Mount Analyses
  • Antenna Mount Designs
  • Stealth Designs
  • Tower Mappings
  • Foundation Mappings
  • Geotechnical Soil Borings
  • Tower Analyses
  • Tower Modifi cation Designs
  • Tower Evaluations
  • Electrical Upgrade Designs
  • Construction / Permit Drawings
  • Pre- and Post-construction Roofing Inspections
  • Special Inspections
  • Annual Inspections